Interstate 85 in Georgia
I-85 highlighted in red | ||||
| Route information | ||||
| Maintained by GDOT | ||||
| Length | 179.90 mi[1] (289.52 km) | |||
| Existed | 1960[2]–present | |||
| NHS | Entire route | |||
| Major junctions | ||||
| South end | ||||
| North end | ||||
| Location | ||||
| Country | United States | |||
| State | Georgia | |||
| Counties | Harris, Troup, Meriwether, Coweta, Fulton, Clayton, DeKalb, Gwinnett, Barrow, Jackson, Banks, Franklin, Hart | |||
| Highway system | ||||
| ||||
| ||||
| ||||
Interstate 85 (I-85) is a major Interstate Highway that travels northeast–southwest in the US state of Georgia. It enters the state at the Alabama state line near West Point, and Lanett, Alabama, traveling through the Atlanta metropolitan area and to the South Carolina state line, where it crosses the Savannah River near Lake Hartwell. I-85 connects North Georgia with Montgomery, Alabama, to the southwest, and with South Carolina, North Carolina, and Virginia to the northeast. Within Georgia, I-85 is also designated as the unsigned State Route 403 (SR 403).
I-85 in Georgia usually travels roughly parallel with the route of US Route 29 (US 29). However, from Atlanta northeast to South Carolina, I-85 ventures away from that route, traveling about halfway between US 29 and the combination of US 23 and US 123.
Within the city of Atlanta, I-85 has a concurrency with I-75 known as the "Downtown Connector". After splitting from Downtown Connector, it is known as Northeast Expressway until its junction with I-285 (The Perimeter).
Route description
[edit]Alabama state line to I-185
[edit]
I-85 enters the state of Georgia from Alabama via twin bridges over the Chattahoochee River, and then it immediately skirts the town of West Point, with Kia's multibillion-dollar plant located adjacent to the freeway just east of West Point. After leaving West Point, I-85 enters the LaGrange area, the first large town in Georgia on its route to the northeast. Northeast of LaGrange, I-85 has an interchange with the long spur freeway, I-185, to the Columbus metropolitan area. This is the only connection between Columbus and the Interstate Highway System.
An 18-mile (29 km) stretch between the Alabama line and exit 18 in LaGrange is serving as an environmental and technological testbed for a project called The Ray, a partnership involving federal and state officials, the private sector, academia and philanthropic organizations. Among the projects are a solar-paved roadway, enhanced road striping for autonomous vehicles, and plantings along the right-of-way to improve runoff and possibly serve as a harvestable crop.[3]
I-185 to Atlanta
[edit]
From LaGrange, I-85 heads northeastward toward Atlanta. Before reaching Atlanta, the highway crosses the CSX Transportation A&WP Subdivision twice (in the Grantville area) and passes through the suburbs of Moreland, Newnan, Fairburn, and Union City. The highway then intersects I-285 at its southwest end in College Park. This interchange is one of the most complex interchanges in the country, as I-285 and I-85 stay side by side through the interchange, which actually has two parts. The interchange also features many other, less important local access roads at the same time; meanwhile providing access to Hartsfield–Jackson Atlanta International Airport. I-85 then runs along the northwestern boundary of the airport in East Point, providing access to the domestic terminal.
At the southwestern edge of Atlanta's city limits, I-85 merges with I-75 to form the Downtown Connector, which is 12 to 14 lanes wide. At the southern edge of Downtown Atlanta, this freeway has an interchange with the major east–west Interstate Highway, I-20. The two freeways then skirt the eastern edge of downtown, running due north, passing through the Georgia Tech campus and the Atlantic Station section of Atlanta before the two highways split, with I-75 exits via the right three lanes and then heads northwest while I-85 uses the left three lanes and then heads northeast.
Atlanta to South Carolina state line
[edit]
Heading northbound after the Brookwood Interchange with I-75, I-85 is routed along a 10-lane-wide viaduct from the Buford Highway Connector (exit 86) to SR 400 (exit 87). Continuing northeast of Atlanta, I-85 continues through the northeastern suburbs, bypassing Chamblee and Doraville, where there is another intersection with I-285 (nicknamed Spaghetti Junction). The Interstate then travels through the northeastern suburbs of Atlanta, including Lilburn, Duluth, Lawrenceville, and Buford. The Interstate has freeway interchanges with SR 316 in Duluth and I-985 in Suwanee, which provides a link to Gainesville. Satellite Boulevard within Gwinnett County parallels I-85 to the west as an arterial frontage road.
I-85 eventually leaves the Atlanta metropolitan area and narrows down to four lanes (two in each direction) past exit 149 as the highway continues into the rural parts of northeast Georgia. At Lake Hartwell, which was formed by the damming of the Savannah River, I-85 crosses the Savannah River into South Carolina.
Express lanes
[edit]
The 26 miles (42 km) of toll manged lanes are operated by the State Road & Tollway Authority (SRTA) and are contained entirely within the median of I-85 with various connecting points to and from the general purpose lanes. The express lanes (one lane for each direction) begin at Chamblee–Tucker Road and end at Hamilton Mill Road; the maximum speed limit is 65 mph (105 km/h).[4]
Only vehicles with two-axles or motorcycles are allowed on the express lanes. Emergency vehicles when responding to emergencies and mass transit vehicles are exempt and are not tolled. Crossing the solid double white line to enter or exit the carpool lane is illegal; If caught by automated gantries, it incurs a civil toll violation of $25.[5]
Funds generated from the express lanes are to be used to defray the costs of construction, operations, and maintenance of the lanes. Long-term revenue allocation is being studied and a decision about future excess revenues will be made later in the project process.[6]
Tolls
[edit]The express lanes uses open road tolling, with tolls only payable with a valid transponder (Peach Pass, E-PASS/Uni, E-ZPass, NC Quick Pass, or SunPass). Toll rates are based on a dynamic pricing, which means toll prices will fluctuate periodically throughout the day based on real-time traffic conditions.[4]
Off-peak hours will have the minimum toll rate, which is available weekdays from 10:00 a.m. to 3:00 p.m., evenings from 8:00 p.m. to 6:00 a.m., weekends, and holidays.[4][7]
HOV3+
[edit]Vehicles with three passengers or more may use the express lanes toll-free, provided they have a Peach Pass account and use Peach Pass Verify via mobile app.[8] Motorcyclists ride toll-free, provided they have a Peach Pass Account and transponder.[9] Interoperable toll accounts are ineligible for exemptions.[10] Violating carpool lane laws in Georgia results in a misdemeanor moving violation with penalties escalate with repeated offenses.[11]
History
[edit]Planning and construction
[edit]
The first sections of I-85 to be built in Georgia were the portions in Atlanta that are part of the Downtown Connector and Northeast Expressway, and predate the Federal-Aid Highway Act of 1956. The first section, located between Williams Street and Peachtree Street, began in September 1948, and was dedicated and opened to traffic on September 25, 1951. This section contained an interchange that became northern interchange with I-75.[12] Work on a southern stretch of the Connector, a 1.4-mile (2.3 km) section between University Avenue and Richardson Street, began in March 1955, and was dedicated and opened on July 25, 1957.[13] The 0.6 mi-long (0.97 km) stretch from Piedmont Avenue to Williams Street opened on May 5, 1959.[14] Construction on the final stretch of the connector, the 2.3-mile (3.7 km) stretch between Richardson Street and Piedmont Avenue, including the interchange with I-20, began on February 26, 1962,[15] and was opened to traffic on September 18, 1964.[16][17] A ribbon-cutting ceremony for the Downtown Connector, attended by Governor Carl Sanders, FHWA administrator Rex Marion Whitton, and Atlanta mayor Ivan Allen Jr. was held inside the Georgia State Capitol on October 15, 1964.[18]
During the planning phase, three alignments were considered for I-85 between Atlanta and South Carolina: a southern route through Athens to provide an easy link between the capital city and the University of Georgia, a northern route through Gainesville, and a route in between.[19] Planners initially chose the northern route, but after Ernest Vandiver was elected Governor in 1958, he worked to make sure the highway traversed his home county of Franklin, a stretch that now bears his name. In response, the north route was withdrawn from consideration in February 1959.[20] Two months later, an agreement was reached with South Carolina for the Tugaloo River bridge location.[21] On April 19, 1960, the Bureau of Public Roads approved the middle alignment between the complete section in Suwanee and the state line.[22] Vandiver denied that the rerouting was intended to financially benefit him and echoed highway department officials who said the central alignment was the most cost-effective.[23] He also promised equivalent access for Athens and Gainesville. Gainesville received its spur, I-985, in 1969,[24] but it was not until the completion of SR 316 in 1995 that there was finally a relatively quick, multi-lane expressway connecting Athens and Atlanta. Unlike I-985, however, SR 316 is not a fully controlled-access highway.[25][26]
I-85 between Atlanta and the South Carolina state line was the first major leg of the Interstate Highway System in Georgia to be completed. The six-mile (9.7 km) section between SR 17 in Lavonia and the South Carolina line opened on June 18, 1964.[27] The state announced the opening of the six-mile (9.7 km) section between SR 51 and SR 106/145 in Carnesville on September 1, 1964.[28] On November 15, 1964, the state announced the opening of the 10-mile (16 km) section between US 441 near Commerce and SR 51.[29] The three-mile (4.8 km) segment between SR 98 and US 441 opened on July 20, 1965.[30][31] On August 3, 1965, the 8.5-mile (13.7 km) section between SR 317 near Suwanee and Hamilton Mill Road opened.[32] The 9.5-mile (15.3 km) link between Hamilton Mill Road and SR 53 in Braselton opened on August 31, 1965.[33] The 10-mile (16 km) section between US 129 near Jefferson and SR 98 opened on October 16, 1965.[34] The final section, seven miles (11 km) between SR 53 in Braselton and US 129, opened on November 5, 1965. This completed I-85 between Atlanta and Charlotte.[35] The 30-mile (48 km) section between LaGrange and Newnan was incomplete for a much-longer time that the rest of I-85 in Georgia and required a two-lane detour on US 27 and US 29 between those cities. The northern section between Newnan and Grantville was completed first.[36]
Southwest of Atlanta, construction began in 1960 on the 3.5-mile (5.6 km) section between US 29 in Lanett, Alabama, and SR 18 in West Point. This project experienced multiple delays, and the section did not open until June 2, 1965.[37] Construction began on the 13-mile (21 km) segment between Collinsworth Road in Palmetto and I-285 in December 1963, and it opened to traffic on April 27, 1967.[38] Construction on the nine-mile (14 km) segment between SR 34 in Newnan and Collinsworth Road began in June 1968 and it was dedicated and opened on August 19, 1970.[39][40] Construction on the 5.7-mile (9.2 km) section between US 27 Alt./US 29 near Newnan and SR 34 began on June 11, 1969, and was dedicated and opened on July 20, 1971.[41] Six miles (9.7 km) between US 29 near Grantville and Moreland and US 27 Alt./US 29 was completed in September 1974.[42] The final section of I-85 in Georgia, 18 miles (29 km) between LaGrange and Grantville, was dedicated an opened to traffic on November 22, 1977, in a ceremony officiated by Governor George Busbee, Alabama Governor George Wallace, GDOT commissioner Tom Moreland, and Alabama highway director Ray Bass.[43][44] This was also the last section on the entirely of I-85 to be completed.[45]
Later history
[edit]Even before I-85 was complete, portions in Atlanta were already over capacity, and the Georgia Department of Transportation began improvement projects. In June 1975, a contract was awarded to widen the four-mile (6.4 km) between I-285 in College Park and near Sylvan Road in Hapeville, relocate the highway approximately 1⁄3 mile (0.54 km) to the west to make way for the near airport terminal, and construct new interchanges for airport access. This project was completed in December 1979.[19][46] Originally constructed as a four- to six-lane expressway in the 1950s, the 4.2-mile (6.8 km) stretch of I-85 between the southern merge with I-75 and SR 42 (North Druid Hills Road) was reconstructed as part of GDOT's Freeing the Freeways program. This project included rebuilding all overpasses, new HOV-ready ramps (with the system implemented in 1996), and a widening of freeway capacity. Concurrent with this project was the construction of the Civic Center station as part of the West Peachtree Street overpass, which opened in December 1981.
The 6.2-mile (10.0 km) portion between SR 42 and I-285 was widened to five lanes in each direction between April 1979 and July 1982. The adjacent 4.2-mile (6.8 km) portion between I-75 and SR 42 was widened between January 1981 and October 1984. Approximately two-mile (3.2 km) of this section between north of I-75 and the present-day SR 400 interchange was constructed on an entirely new alignment adjacent to the old route on the north side, which includes a long viaduct over a railyard. The old alignment is now part of SR 13, and is called Buford Spring Connector. In addition, the new viaduct was designed to accommodate connections to the SR 400 tollway (then in planning), HOV lanes, and a bridge carrying the North Line (then under construction, now the Red Line).[19][47] The first Downtown Connector portion to be widened was the northernmost 2.1 miles (3.4 km) between Williams Street and I-75, which also included extensive modification of the I-75 interchange. This occurred between July 1981 and July 1985.[19] The last Downtown Connector project, 2.3 miles (3.7 km) between Georgia Avenue and North Avenue, opened on May 15, 1989, after years of delays.[48]
In 1996, high-occupancy vehicle lanes (HOV) were opened along I-85 within Atlanta's perimeter, as part of the infrastructure improvements related to the 1996 Summer Olympics; it allowed two or more passengers per vehicle to be able to use the lane (HOV2+). On October 31, 2001, another 23.6 miles (38.0 km) of HOV lanes opened along I-85 in Gwinnett County.[11][49]
Until 2000, the state of Georgia used the sequential exit numbering system on all of its Interstate Highways. The first exit on each highway would begin with the number 1 and increase numerically with each exit. In 2000, GDOT switched to a mileage-based exit system, in which the exit number corresponded to the nearest milepost.[50][51]
On October 1, 2011, GDOT converted 15.5-mile (24.9 km) HOV lanes, from Atlanta's perimeter north in Gwinnett and DeKalb counties, into high-occupancy toll lanes. The signed Express lanes were a first in Georgia, where travelers that did not meet the now required three or more passengers per vehicle or other exemptions would be charged a toll varying from 10 to 90 cents per mile (6.2–55.9 ¢/km), depending on traffic conditions and usage. The Express lanes traversed between Chamblee–Tucker Road (exit 94) to Old Peachtree Road (exit 109).[49][52][53][54]
Proponents for the express lanes say it is to provide commuters with a more reliable, free-flow commute option; complement the state's multimodal approach to managing traffic demand; and establish the vision for a future system of HOT lanes in the region.[53] Detractors point out that existing infrastructure was reused for the express lanes and that commute times on the nonpaying travel lanes have doubled since implementation.[55][56]
On March 30, 2017, a fire started at approximately 6:15 pm in a storage area under the highway along Piedmont Road in the Piedmont Heights area of Midtown Atlanta. This caused the collapse of a 100-foot (30 m) section of I-85 northbound. The highway in both directions needed to be demolished and replaced. According to GDOT, the work was completed ahead of schedule. Both the north and south bound portions of the Interstate were open by May 15, 2017, a month ahead of expectations.[57]
In May 2017, the Gwinnett County Board of Commissioners voted to accept about $6 million (equivalent to $7.53 million in 2024[58]) in federal funds, to be used to acquire land to build a new diamond interchange on I-85 at SR 324/Gravel Springs Road between the interchanges for SR 20, and Hamilton Mill Road/Hamilton Mill Parkway.[59] The board voted in July 2019 to accept about $20 million (equivalent to $24.1 million in 2024[58]) in federal and state grants to pay for the construction of the new interchange. E.R. Snell Contractors was chosen to complete the work.[60] Since an overpass already existed for SR 324, the entrance and exit ramps, deceleration lanes on I-85, traffic signals, and turn lanes were the main aspects of the interchange to be added.[61] The main purpose of the new interchange was to provide another access point from I-85 to Mall of Georgia.[59] Construction of the interchange began in early 2018 and was completed on November 23, 2021.[62]
On November 3, 2018, an extension to the express lanes opened, from its former ending at Old Peachtree Road (exit 109) to Hamilton Mill Road (exit 120).[63] After this extension, four more northbound exit points were added: at SR 317 (exit 111), I-985 (exit 113), SR 20 (exit 115), and at its end at Hamilton Mill Road (exit 120). In addition, four new access points were added to the southbound express lanes: at SR 20, SR 317, Old Peachtree Road, and at the connection to the preexisting express lanes.[64] The project cost $178 million (equivalent to $218 million in 2024[58]).[65]
Exit list
[edit]| County | Location | mi | km | Old exit | New exit | Destinations | Notes | |
|---|---|---|---|---|---|---|---|---|
| Harris | | 0.00 | 0.00 | Continuation into Alabama over the Chattahoochee River | ||||
| Troup | West Point | 2.25 | 3.62 | 1 | 2 | |||
| | 6.52 | 10.49 | 6 | KIA Boulevard | To KIA Assembly Plant | |||
| | 13.01 | 20.94 | 2 | 13 | To Pegasus Parkway, an industrial and recreational bypass around Downtown LaGrange | |||
| LaGrange | 14.25 | 22.93 | 3 | 14 | ||||
| 18.12 | 29.16 | 4 | 18 | |||||
| | 19.70– 20.08 | 31.70– 32.32 | 5 | 21 | To Fort Benning | |||
| Hogansville | 28.35 | 45.62 | 6 | 28 | ||||
| Meriwether |
No major junctions | |||||||
| Coweta | Grantville | 35.24 | 56.71 | 7 | 35 | |||
| Newnan | 41.22 | 66.34 | 8 | 41 | To SR 16 | |||
| 44.02 | 70.84 | 44 | Poplar Road | Provides direct access to Piedmont Newnan Hospital | ||||
| 46.68 | 75.12 | 9 | 47 | To business district | ||||
| | 51.28 | 82.53 | 10 | 51 | ||||
| | 56.37 | 90.72 | 11 | 56 | Collinsworth Road – Palmetto, Tyrone | |||
| Fulton | Fairburn | 61.26 | 98.59 | 12 | 61 | |||
| Union City | 64.17 | 103.27 | 13 | 64 | ||||
| College Park | 65.86 | 105.99 | 14 | 66 | Flat Shoals Road | To Georgia Military College | ||
| | 68.77– 69.02 | 110.67– 111.08 | 15 | 68 | Northbound exit and southbound entrance; split into I-285 north (Birmingham, Chattanooga) and I-285 east (International Terminal, Macon) | |||
| | 69.14 | 111.27 | 16A | 69A | ||||
| College Park | 69.61 | 112.03 | 16B | 69B | ||||
| 70.30 | 113.14 | 17 | 70 | Southbound exit and northbound entrance; to International Terminal | ||||
| Clayton | | 71.05 | 114.34 | 18 | 71 | |||
| Fulton | College Park | 72.27– 72.61 | 116.31– 116.85 | 18A | 72 | To College Park Transit Station | ||
| East Point | 73.72 | 118.64 | 19 | 73 | Virginia Avenue – Air Cargo, College Park | Signed as exits 73A (east) and 73B (west) northbound | ||
| 74.03 | 119.14 | 20 | 74 | Southbound exit and northbound entrance | ||||
| Hapeville | 74.57 | 120.01 | 21 | 75 | Sylvan Road / Central Avenue – Hapeville | |||
| Atlanta | 75.78 | 121.96 | 22 | 76 | To Atlanta Technical College | |||
| 76.08 | 122.44 | 23 | 77 | Southbound exit and northbound entrance | ||||
| 76.70 | 123.44 | 24 | 77 | Northbound exit and southbound entrance | ||||
| 87 | Southern end of I-75/SR 295 concurrency along the Downtown Connector; southern terminus of SR 295; freeway uses I-75 mileposts and exit numbers; HOV lanes to and from I-75 to the south (no HOV ramps to or from I-85 to the south). | |||||||
| — | — | Southern terminus of HOV3+/toll lanes | ||||||
| 77.30 | 124.40 | 88 | 243 | |||||
| 79.14 | 127.36 | 89 | 244 | University Avenue / Pryor Street | ||||
| 80.19 | 129.05 | 90 | 245 | Abernathy Boulevard / Capitol Avenue – Georgia State Stadium | Northbound exit and southbound entrance | |||
| 80.54 | 129.62 | 91 | 246 | Fulton Street / Central Avenue – Georgia State University, Georgia State Stadium | ||||
| 80.78 | 130.00 | 92 | 247 | |||||
| 81.00 | 130.36 | — | — | Memorial Drive | HOV ramps for northbound exit and southbound entrance | |||
| 81.16 | 130.61 | 93 | 248A | ML King Jr. Drive – State Capitol, Georgia State Stadium | Southbound exit and northbound entrance | |||
| 81.74 | 131.55 | 94 | 248B | Edgewood Avenue, Auburn Avenue, J.W. Dobbs Avenue | Northbound exit and southbound entrance | |||
| 82.11 | 132.14 | 96 | 248C | Western terminus of SR 10 | ||||
| 81.97 | 131.92 | 95 | 248D | Jesse Hill Drive, J.W. Dobbs Avenue, Edgewood Avenue | Southbound exit and northbound entrance | |||
| 82.00 | 131.97 | — | — | Piedmont | HOV ramps for northbound exit and southbound entrance | |||
| 82.53 | 132.82 | 97 | 249A | Courtland Street – Georgia State University | Southbound exit only | |||
| 82.79 | 133.24 | 98 | 249B | Pine Street, Peachtree Street – Civic Center | Northbound exit only | |||
| 82.98 | 133.54 | 99 | 249C | Williams Street – World Congress Center, Mercedes-Benz Stadium, Aquarium | No northbound exit; additional HOV ramps for southbound exit and northbound entrance | |||
| 100 | 249D | Northbound exit and southbound entrance | ||||||
| 83.18 | 133.87 | 100 | 249D | Southbound exit and northbound entrance | ||||
| 83.89– 84.24 | 135.01– 135.57 | 101 | 250 | 10th Street, 14th Street – Georgia Tech | Northbound exit and southbound entrance | |||
| 84.58 | 136.12 | 251A | 17th Street – Midtown | Northbound exit only | ||||
| 26 | 84 | 17th Street, 14th Street, 10th Street | Southbound exit only, to Georgia Tech | |||||
| 84.92 | 136.67 | 27 | 85 | Northern end of I-75/SR 295 concurrency along the Downtown Connector; southern terminus of SR 295 | ||||
| 85.92 | 138.27 | 28 | 86 | Northbound exit and southbound entrance; southern terminus of SR 13 | ||||
| 86.00 | 138.40 | — | — | Lindbergh Drive | HOV-only ramps; southbound exit and northbound entrance | |||
| 86.92– 87.68 | 139.88– 141.11 | 29 | 87 | Northbound exit and southbound entrance; southern terminus of SR 400 | ||||
| 87.77 | 141.25 | 28 | 86 | Southbound exit and northbound entrance; southern terminus of SR 400 | ||||
| 88.11 | 141.80 | 30 | 88 | Cheshire Bridge Road / Lenox Road | Southbound exit and northbound entrance | |||
| DeKalb | Brookhaven | 89.23 | 143.60 | 31 | 89 | To Oglethorpe University | ||
| | 90.65 | 145.89 | 32 | 91 | To DeKalb-Peachtree Airport and Emory University | |||
| Doraville | 92.91 | 149.52 | 33 | 93 | Shallowford Road – Doraville | To Briarcliff Road | ||
| Chamblee | 94.26 | 151.70 | 34 | 94 | Chamblee–Tucker Road, Mercer University | |||
| | 95.46 | 153.63 | 35 | 95 | Signed as exits 95A (east, Macon, Augusta) and 95B (west, Chattanooga, Birmingham) southbound | |||
| | 96.06 | 154.59 | 36 | 96 | Northcrest Road / Pleasantdale Road | |||
| Gwinnett | Norcross | 98.80 | 159.00 | 37 | 99 | Eastern terminus of SR 140 | ||
| 100.94 | 162.45 | 38 | 101 | Indian Trail–Lilburn Road | ||||
| | 102.06 | 164.25 | 39 | 102 | ||||
| | 103.56 | 166.66 | 39A | 103 | Steve Reynolds Boulevard | Northbound exit and southbound entrance | ||
| | 104.07 | 167.48 | 40 | 104 | Pleasant Hill Road | Gwinnett Place Mall; To Ronald Reagan Parkway | ||
| | 105.98 | 170.56 | 42 | 105 | Northbound exit only | |||
| | 41 | 106 | No southbound exit; additional northbound exit and southbound entrance ramps for direct HOT/express lane access; western terminus of SR 316 | |||||
| | 107.03 | 172.25 | 42 | 107 | Southbound exit only | |||
| | 107.84 | 173.55 | 108 | Sugarloaf Parkway | Southbound exit is combined with exit 109. | |||
| | 108.96 | 175.35 | 43 | 109 | Old Peachtree Road | |||
| | 110.85 | 178.40 | — | 110 | McGinnis Ferry Road | Northbound exit and southbound entrance; opened on June 25, 2026 | ||
| | 111.46 | 179.38 | 44 | 111 | Southern terminus of SR 317 | |||
| | 112.96 | 181.79 | 45 | 113 | Northbound exit and southbound entrance, to Buford Dam and Lake Lanier Islands; left exit northbound; southern terminus of I-985/SR 365/SR 419 | |||
| | 115.22 | 185.43 | 46 | 115 | To Mall of Georgia | |||
| Buford | 118.00 | 189.90 | — | 118 | To Mall of Georgia | |||
| | 119.81 | 192.82 | 47 | 120 | Hamilton Mill Road / Hamilton Mill Parkway | |||
| Gwinnett | | — | — | Northern terminus of HOV3+/toll lanes | ||||
| Barrow | Braselton | 126.10 | 202.94 | 48 | 126 | |||
| Jackson | 129.37 | 208.20 | 49 | 129 | To Michelin Raceway | |||
| Jefferson | 136.60 | 219.84 | 50 | 137 | To Athens and University of Georgia | |||
| 140.41 | 225.97 | 51 | 140 | |||||
| Commerce | 146.58 | 235.90 | 52 | 147 | ||||
| Banks | 149.32 | 240.31 | 53 | 149 | To University of Georgia | |||
| | 153.74 | 247.42 | 54 | 154 | ||||
| Franklin | | 159.82 | 257.21 | 55 | 160 | |||
| | 163.87 | 263.72 | 56 | 164 | ||||
| | 165.91 | 267.01 | 57 | 166 | ||||
| Lavonia | 173.10 | 278.58 | 58 | 173 | ||||
| Hart | Lake Hartwell | 177.24 | 285.24 | 59 | 177 | Northern terminus of SR 77 | ||
| | 179.13 | 288.28 | Continuation into South Carolina over the Tugaloo River and Lake Hartwell | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Auxiliary routes
[edit]There are three auxiliary Interstate Highways of I-85 within Georgia and a fourth that was proposed, and then cancelled. I-185 (SR 411) is a spur from LaGrange to Columbus. It mainly provides a freeway between the Columbus and Atlanta metropolitan areas. I-285 (SR 407) is a heavily traveled beltway around Atlanta, which helps I-75 and I-85 drivers to bypass the city. I-485 was a short freeway in Atlanta (now Freedom Parkway) that was incomplete for many years and then decommissioned due to local opposition. I-985 (SR 419) is a spur from I-85 to Gainesville.
See also
[edit]References
[edit]- ↑ Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Archived from the original on July 3, 2017. Retrieved August 20, 2022.
- ↑ State Highway Department of Georgia (1960). State Highway System and Other Principal Connecting Roads (PDF) (Map) (1960–1961 ed.). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved July 12, 2016. (Corrected to June 1, 1960.)
- ↑ Wagenblast, Bernie. "Exploring The Ray, An Interview with Allie Kelly". ETAP Podcast. American Association of State Highway and Transportation Officials. Archived from the original on March 18, 2023. Retrieved May 17, 2020.
- 1 2 3 "Real-Time Toll Rates - Peach Pass". State Road & Tollway Authority. Retrieved June 7, 2026.
- ↑ "I-85 Express Lanes (HOT Lanes)". Georgia Department of Public Safety. Retrieved June 7, 2026.
- ↑ Georgia Department of Transportation. "I-85 Express Lanes: FAQ". Georgia Department of Transportation. Archived from the original on October 14, 2011. Retrieved November 19, 2011.
- ↑ Associated Press (January 20, 2012). "State Slashes Off-Peak Tolls on Interstate 85". Jacksonville, FL: WTLV. Retrieved June 7, 2026.
- ↑ "Peach Pass Verify". State Road & Tollway Authority. Retrieved June 7, 2026.
- ↑ "Motorcycle Certification on I-85". State Road & Tollway Authority. Retrieved June 7, 2026.
- ↑ "Peach Pass Verify - Peach Pass". State Road & Tollway Authority. Retrieved June 7, 2026.
- 1 2 "High Occupancy Vehicle (HOV) Lanes". Georgia Department of Public Safety. Retrieved June 7, 2026.
- ↑ Joiner, Alex (September 26, 1951). "3,000 Persons See Opening Of $6 Million Expressway". The Atlanta Constitution. pp. 1, 7. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "Griffin Opens New Leg Of Atlanta's Expressway". The Atlanta Constitution. July 26, 1957. p. 15. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "Expressway Link Opens Wednesday". The Atlanta Constitution. May 1, 1959. p. 29. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "Double Shift Possible on Road Link". The Atlanta Constitution. February 28, 1962. p. 5. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ Gaines, Marion (September 19, 1964). "Cars Breeze Along On New Connector". The Atlanta Constitution. pp. 1, 9. Retrieved September 5, 2022.
- ↑ "Connector to Open For Traffic Friday". The Atlanta Constitution. September 16, 1964. pp. 1, 10. Retrieved September 5, 2022 – via Newspapers.com.
- ↑ "Connector Ribbon Cut-Inside Capitol". The Atlanta Constitution. October 16, 1964. p. 25. Retrieved September 5, 2022 – via Newspapers.com.
- 1 2 3 4 Lichtenstein Consulting Engineers (March 2007). Historic Context of the Interstate Highway System in Georgia (PDF) (Report). Georgia Department of Transportation. Archived (PDF) from the original on August 21, 2021. Retrieved August 19, 2022.
- ↑ "State Withdraws Interstate Route Proposal; New Course May Be Nearer Vandiver's Home". The Macon News. United Press International. March 25, 1959. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "States Clear Obstacle On Super Road". The Columbus Ledger. Associated Press. April 30, 1959. p. 22. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Middle Route Chosen For Interstate 85". The Columbus Enquirer. Associated Press. April 20, 1960. p. 7. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ Wynn, Jim (November 18, 1959). "Road Route Change Laid To Griffin". The Macon Telegraph. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ Stephens, Gene (October 15, 1969). "Maddox Opens The Perimeter". The Atlanta Constitution. pp. 1A, 10A. Retrieved August 20, 2022 – via Newspapers.com.
- ↑ "Highway 316 improvements sought". The Augusta Chronicle. May 28, 2010. Retrieved July 15, 2026.
- ↑ Ford, Wayne (June 6, 2015). "Georgia Highway 316 sparked commercial bonanza in Oconee". Athens Banner-Herald. Retrieved July 15, 2026.
- ↑ "Seven Miles of I-85 Opens Near Lavonia". The Gainesville Times. Gainesville, Georgia. June 19, 1964. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "I-85 Section Opens Near S.C. Border". The Atlanta Journal. September 1, 1964. p. 2. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "I-Highways Are Opened". The Macon Telegraph and News. Associated Press. November 15, 1964. p. 8. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "State Expects to Open I-85 To S. Carolina This Year". The Atlanta Constitution. July 23, 1965. p. 5. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Interstate About Ready To Greenville". The Daily Times. Gainesville, Georgia. July 28, 1965. p. 34. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "8.5-Mile I-85 Strip Opens in Gwinnett". The Atlanta Constitution. August 4, 1965. p. 23. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Atlanta-to-Greenville I-85 May Be Opened by Nov. 1; 9½ Miles Ready For Cars To Use Tuesday". The Daily Times. Gainesville, Georgia. August 29, 1965. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Another 10 Miles I-85 To Open Permanently". The Daily Times. Gainesville, Georgia. October 15, 1965. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Atlanta-to-Carolina I-85 Is Ready Today". The Gainesville Times. Gainesville, Georgia. November 5, 1965. p. 1. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "I-85 completed between LaGrange & Grantville". Newspapers.com. Burlington, North Carolina: The Daily Times-News. October 7, 1977. p. 16. Archived from the original on February 2, 2017. Retrieved August 20, 2022.
- ↑ "Link Opened On Interstate At West Point". The Columbus Ledger. Newnan, Georgia. June 3, 1965. p. 42. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Highway I-85 Now Open to Palmetto". The Newnan Times-Herald. April 27, 1967. p. 11B. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "I-85 Officially Opened To Newnan Wednesday". The Newnan Times-Herald. August 20, 1970. pp. 1A, 2A. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Georgia Opens Another Interstate 85 Section". The Macon News. United Press International. August 20, 1970. p. 3D. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "New I-85 Section Opened Tuesday". The Newnan Times-Herald. July 22, 1971. p. 1A. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ Sellers, Beryl (September 30, 1974). "Interstate Funds Hard To Obtain". The Columbus Enquirer. p. B-1. Retrieved July 17, 2026 – via Newspapers.com.
- ↑ "Interstate 85 Officially Open To Holiday Traffic". Newnan Times-Herald. November 23, 1977. p. 1A. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ Sellers, Beryl (November 23, 1977). "I-85 Missing Link Opens". The Columbus Enquirer. pp. A-1, A-2. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "LaGrange I-85 Link Opens". The Columbus Ledger. United Press International. November 22, 1977. p. A-2. Retrieved July 15, 2026 – via Newspapers.com.
- ↑ "Atlanta's Midfield Under Construction". sunshineskies.com. Sunshine Skies. Retrieved July 15, 2026.
- ↑ "State Route 13 Page". Peach State Roads. Archived from the original on May 23, 2007. Retrieved May 27, 2007.[self-published source]
- ↑ Beasley, David (May 13, 1989). "State Scheduled to Open Expanded Interstate Link In Downtown on Monday". The Atlanta Journal & Constitution. p. F-4. Retrieved July 15, 2026 – via Newspapers.com.
- 1 2 "Background on Atlanta I-85 HOV to HOT Conversion". Georgia Institute of Technology. Retrieved June 7, 2026.
- ↑ Georgia Department of Transportation. "Georgia's Interstate Exit Numbers". Georgia Department of Transportation. Archived from the original on March 29, 2002. Retrieved April 30, 2007.
- ↑ Georgia Department of Transportation. "Interstate 20 Exit Renumbering Page". Georgia Department of Transportation. Archived from the original on June 5, 2002. Retrieved April 30, 2007.
- ↑ Georgia Department of Public Safety. "I-85 Express Lanes (HOT Lanes)". Georgia Department of Public Safety. Archived from the original on January 13, 2017. Retrieved February 26, 2017.
- 1 2 Georgia Department of Transportation. "I-85 Express Lanes". Georgia Department of Transportation. Archived from the original on September 22, 2011. Retrieved November 19, 2011.
- ↑ "100,000th Peach Pass Issued for Controversial HOT Lanes". The Atlanta Journal-Constitution. Archived from the original on November 4, 2011. Retrieved November 19, 2011.
- ↑ McKee, Don. "Commuters getting hot about HOT lanes in metro Atlanta". The Marietta Daily Journal. Retrieved November 19, 2011.
{{cite web}}: CS1 maint: deprecated archival service (link) - ↑ "HOT Lane Unhappiness: Some Drivers Say Congestion Worse". The Atlanta Journal-Constitution. Archived from the original on October 30, 2011. Retrieved November 19, 2011.
- ↑ Georgia Department of Transportation (April 4, 2017). "Georgia DOT Aims to Reopen I-85 by June 15" (Press release). Georgia Department of Transportation. Archived from the original on April 6, 2017. Retrieved April 6, 2017.
- 1 2 3 Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- 1 2 Estep, Tyler (n.d.). "More funding approved for new I-85 interchange in Gwinnett". The Atlanta Journal-Constitution. Archived from the original on August 9, 2019. Retrieved August 9, 2019.
- ↑ Estep, Tyler (July 17, 2019). "That new I-85 interchange near Buford could be under construction soon". The Atlanta Journal-Constitution. Archived from the original on August 9, 2019. Retrieved August 9, 2019.
- ↑ McCarley, Billy J. "Phase I Archaeological Survey of I-85 at SR 324 Interchange | Georgia Archaeological Site File". archaeology.uga.edu. Archived from the original on August 9, 2019. Retrieved August 9, 2019.
- ↑ Huppertz, Karen (November 22, 2021). "Gwinnett opens new I-85 interchange at Gravel Springs Road in Buford". The Atlanta Journal-Constitution. Retrieved October 22, 2025.
- ↑ Yeomans, Curt. "Georgia set to open I-85 toll lane extension Saturday". Gwinnett Daily Post. Archived from the original on August 9, 2019. Retrieved August 9, 2019.
- ↑ "Fact Sheet: I-85 Express Lanes Extension" (PDF). State Road and Tollway Authority. Archived (PDF) from the original on October 8, 2022. Retrieved August 20, 2022.
- ↑ "I-85 Express Lanes Extension". www.dot.ga.gov. Archived from the original on August 8, 2019. Retrieved August 9, 2019.
External links
[edit]
Media related to Interstate 85 in Georgia (U.S. state) at Wikimedia Commons
- Interstate Highways in Georgia (U.S. state)
- Interstate 85
- Transportation in Harris County, Georgia
- Transportation in Troup County, Georgia
- Transportation in Meriwether County, Georgia
- Transportation in Coweta County, Georgia
- Transportation in Fulton County, Georgia
- Roads in Atlanta
- Transportation in Clayton County, Georgia
- Transportation in DeKalb County, Georgia
- Transportation in Gwinnett County, Georgia
- Transportation in Barrow County, Georgia
- Transportation in Jackson County, Georgia
- Transportation in Banks County, Georgia
- Transportation in Franklin County, Georgia
- Transportation in Hart County, Georgia
- High-occupancy toll roads
